How Long Does It Take to Build a House?

There are many beautiful homesites on the market. Let’s look for the perfect site for your new home.

Eye on Housing

The 2012 Survey of Construction (SOC) from the Census Bureau shows that on average it takes about 7 months from obtaining a building permit to completing a new single-family home. Looking at the houses completed in 2012, houses built for sale, on average, register the shortest time from permits to completion – between 5 and 6 months. Houses built on owner’s land take longer – about 8 months if built by a contractor and more than 11 months if they are owner-built (i.e., where the owner of the land serves as a general contractor). Single-family homes built for rent take, on average, between 8 and 9 months from permits to completion.

In most cases, no time is wasted from the moment a permit is obtained and construction is started. Most homes built for sale and on owners’ land are started prior or within the same month as authorization. Houses built…

View original post 225 more words

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s